In the complete four-station Shipwright architecture, which sequence accurately represents how an issue transitions from raw intent to production release?
Shipwright Capstone: Ship a Change End to End
Run a real issue through all four stations, measure the run, and plan the next loop. Turn Shipwright into a portfolio artifact and a sustainable practice.
Loading lesson content...
When evaluating the scorecard of a completed Shipwright run, why is First-Pass Verification Rate (FPVR) paired with Human Review Duration rather than measuring success purely by total pull requests produced per day?
A developer presents Shipwright as an engineering portfolio project. To demonstrate that the factory is a robust, production-grade system rather than a collection of prompted chat transcripts, what verifiable evidence should the deliverable showcase?